Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig

Product Details
Customization: Available
After-sales Service: One Year
Warranty: One Year
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
OEM Services
The supplier provides OEM services for popular brands
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (17)
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
  • Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
All
Manufacturing Process
Stamping
Surface Treatment
Oxidation
Operation Pressure
Atmospheric Pressure
Material
Cast Steel
Transport Package
Common Export Packaging
Trademark
YINGPAI
Origin
Hebei
HS Code
84139100
Production Capacity
50000pieces/Year

Product Description

 

Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig

Product Description


ZJ20/1350 Oil Drilling Rig
Introduction
2000m series oil drilling rigs are designed and manufactured for exploiting oil and gas well, coalbed methane well, geothermal well, shale gas well and so on. They are characterized by simple structure, easy operation, long durability. The main models are as follows: ZJ20/1350, ZJ20/1350DJ (AC drive), ZJ20/1350DZ (DC drive),ZJ20/1350DB (AC VFD).
Main features
1.Mechanical transmission
2.Power: diesel engine+ decelerator
3.Speeds in gearbox become 4 forward +1reverse by gear transmission
4.Output shaft of gearbox transmit the power to drawworks by chain
5.Reasonable distribution of gears, high use ratio of power
6.ZP175 rotary table
7.Gear-shift of gearbox is controlled by pneumatic system
Main Technical Parameters
 

Model

ZJ20/1350

ZJ20/1350DJ

ZJ20/1350DZ

ZJ20/1350DB

Drilling depth (114mm drill pipe)

2000m

2000m

2000m

2000m

Max. hook load

1350kN

1350kN

1350kN

1350KN

Traveling system structure

4×5

4×5

4×5

4×5

Fast line diameter

φ29mm

φ29mm

φ29mm

φ29mm

Max. pull of fast line

170 kN

170kN

200 kN

200kN

Power of drawworks

400KW

400KW

400KW

400KW

Speed of drawworks

4F+ 1R

4F

2F,Stepless speed regulation

2F,Stepless speed regulation

Input power of rotary table

200 kW

200 kW

200 kW

200 kW

Mast

JJ135/41-K

JJ135/41-K

JJ135/41-K

JJ135/41-K

Substructure

DZ135/2.8-K

DZ135/4.5-K

DZ135/4.5-K

DZ135/3.8-K

Model
XJ750
Transmission
Allison M5610HR × 2
ZJ40CZ
Drilling Depth
3,000m (9,840ft, 4-1/2'' DP)
 
630 HP×2
(470 KW×2)
Workover Depth
8,000m (26,200ft, 2-7/8'' DP)
Net. Height
38m (125ft)
2250kN
 
6,500m (21,330ft, 3-1/2''DP)
Max. Hook Load
1,700kN (382,000 lbf)
1150KN
 
5,000m(16,400ft, 4-1/2''DP )
Effective Lines
10
1000HP
Max. Hook Load
1,700kN(382,000lbf )
Racking Board Capacity
3,000m (9,840ft, 4-1/2'' DP)
Hydraulic+
Mechanical
Wireline Dia.
Φ29mm (1-1/8'' )
Racking Board Height
24m (79ft)
14×10
Traveling System
6×5
Max. Wind Velocity
30m/s (98ft/s)
4000m
Overall Dimensions(L×W×H)
22.2×3.1×4.45m72.8×10.2×14.6ft
Drawwork
38m
Weight
76,000kg (1676,000 lbs)
Rated Power
373kW(500hp) × 2
6m
Max. Travel Speed
45km/h (28mph)
Main Drum
Φ528mm×1041mm(Φ20.8''×41'')
Ф32mm
Carrier
Self-propeller 14×8
Max. Faster Line Pull
280kN (62300lbf)
21MPa
Engine
Cat C15 ACERT AIII × 2
Sanding Drum
Φ315 ×1,005mm(Φ12.4'' ×39.6'')
0.8MPa
Power of Engine
325kW(440hp)/2,100r/min
Air Assist Brake System
KOBELT Disc4-10.5-48.5''
6×5
Overall Size (m)
19.37×3.05×4.49m
20.1×3.05×4.49
23×3.2×4.8
23×3.2×4.8
Weight (kg)
52000 kg
58000Kg
85000 kg
85000 kg
 
 

MastOil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling RigDrawworks and Crown blockOil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig3 T Winch 
Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
Weight Indicator  and deadline anchorOil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig


Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling RigOil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig

Company Profile

Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig


Hebei Yingpai has always taken "serving customers" as its purpose, adhering to the concept of "product quality first", and providing customers with a three-in-one system solution of "production, sales, and service".

Products include oil and gas drilling equipment and accessories, industrial standard parts, mechanical equipment and accessories, etc.

The company strictly implements the quality inspection and technical service system, and has established long-term cooperative relations with large equipment companies such as China National Petroleum Corporation, Lanshi, Honghua, Jerry, and Kerui.

 

As a professional integrated trading and manufacturing company, we highly value the cooperative relationship with our customers. We will always prioritize your needs and provide high-quality services and solutions to help you achieve business success. Hebei Yingpai is ready to work hand in hand with you, mutually dependent and mutually beneficial, for a better tomorrow.
 

Certifications

Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig

 

Packaging & Shipping

Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling RigOil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig

 

FAQ

 

1,Q. How long for your delivery time?
A. It will take about 15-35days to finish an order, but the exact time is according to actual situation.

2,Q. Can you offer OEM or design services? 
A. Yes, we have our own design department. We can make OEM products according your requirements. 

3,Q.How long is the warranty? 
A. 1 year


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier